Great Northern Workings

HISTORIC GOLD PRODUCTION 20x >KALGOORLIE PIT

  • The workings are on a strike of approximately 80 metres long and steeply dip to the north-east. There are exposed stopes on the strike with an offset shaft on the north-east side.
  • Recorded production from this area spans three separate phases totalling 460 tonnes for ~356 oz @21.9g/t.
  • In 1987/88 Melita Mining drilled a series of RC holes. Results are contained in report A25349
  • Several holes intercepted gold grades up to 26.4g/t but none of these holes had collar coordinates.